Textiles Committee invites bids for Mild steel (MS) Window box Grill with rooftop of residential at Poonam Apartment, Dr A.B.Road, Worli, Mumbai -400018. Bidders are requested to submit the details as per the specification given below: Bids Documents 

Textiles Committee invites bids for Mild steel (MS) Window box Grill with rooftop of residential at Poonam Apartment, Dr A.B.Road, Worli, Mumbai -400018. Bidders are requested to submit the details...

1. विभिन्न तकनीकी और गैर-तकनीकी पदों के लिए विस्तृत विज्ञापन. 2. अप्लाई करें 3. श...

Announcement
Posted 11 months ago
Expires in 31/01/2025

1. Detail advertisement for various Technical and Non-Technical posts. 2. Apply Online 3. Corrigendum No.1 Publish Date: Wed, 12/18/2024 – 12:30

Announcement
Posted 11 months ago
Expires in 31/01/2025

1. Detail advertisement for various Technical and Non-Technical posts. 2. Apply Online 3. Corrigendum No.1

Announcement
Posted 11 months ago
Expires in 31/01/2025

Download:  Trade Notice

Announcement
Posted 12 months ago
Expires in 22/12/2024

    circular Page 2 Gazette notification
Announcement
Posted 1 year ago
Expires in 08/12/2024

Download : Viscose Rayon Cut Staple Spun Yarn (Quality Control) Order, 2024

No. 51/09/2015-AD Date: 17th October, 2024 The Textiles Committee, under the Ministry of Textiles, Government of India, invites bids for the repair and whitewashing, along with painting, of a residential quarter at Poonam Apartment, Dr. A.B. Road, Worli, Mumbai - 400018. Bidders are requested to submit their proposals as per the specifications and quantities outlined below: Specifications
Sr. No. Particulars Unit Qty Rate Amount
1 Applying two coats of cement primer, followed by three coats of luster/royal/plastic paint. Wall cracks should be treated with mesh tape and appropriately finished with PoP, including sandpapering, cleaning, and leveling the surface with putty. Paint must be from Asian Paints or Berger. The shade and quality should match the existing walls, gypsum, and wooden partitions. Sq.ft 5000
2 Repair and reinforcement of RCC members (slab, beam, columns). Damaged surfaces must be chased, hacked, and sandblasted. Use an M-30 grade concrete design mix and NITOBOND (or equivalent) for old-new concrete bonding, as per the manufacturer’s specifications. Proper clear cover for columns is 40mm, for beams 25mm, and for slabs 15mm. The rate includes shuttering, scaffolding, and curing for at least 14 days. Sq.ft 200
3 Provide and apply an average 15mm thick waterproof plaster with a 1:4 cement-coarse sand mix on walls. Sq.ft 1000
4 Repair window sliding/seal to prevent rainwater seepage using silicone filling. Sq.ft 400
Subtotal
CGST @ 9%
SGST @ 9%
Grand Total
Terms and Conditions:
  1. The bid shall be on letter-head of the bidder and submitted in a sealed cover  mentioning “Repairing of window and white wash & painting painting of residential quarter at Poonam Apartment, at Textiles Committee, Prabhadevi, Mumbai” on or before 05.11.2024 till 3.00 PM.
  2. EMD :  Interest free EMD of Rs.8000/- by way of Demand Draft in favour of “Textiles Committee” to be submitted along with bid. Non submission of requiste EMD shall reject the bid. The EMD of unsuccessful bidders shall be returned back within 45 days after selection of successful bidder. EMD shall be forfeited incase of alteration of quoted rates and/ or non acceptance of work order after selection/ placement of work order.
  3. Performance Security: The successful bidder shall deposit 5% of total value of contract with Textiles Committee by way of DD as interest free security deposit. In case of non satisfactory performance or breach of contracts the performance security @ 5% so deposited with Textiles Committee shall be forfeited.
  4. The proposed work is enclosed only for reference/ explanatory purpose. The rates shall only be quoted on actual site visit.
  5. The bidder shall visit the residential  quarter at Poonam Apartment, Dr A.B.Road, Worli, Mumbai -400018 for inspection & measurement at site before due date & time only.
  6. Textiles Committee shall not be responsible for any delay in receipt of bid or non-receipt of bid sent by post/ courier. The parties shall submit the bidby post/ courier/ hand delivery in the Admn-HK division of Textiles Committee, Mumbai on or before the due date.
  7. Textiles Committee has the right to accept or reject all or particular bid at any time without assigning any reason thereof.
  8. Payment Terms: The payment will be made on satisfactory completion of work as per the specification contained in the work order and within the time as stipulated in work order. No advance payment.
  9. No damage shall be caused to the property of Textiles Committee & to the property of housing society & nearby houses while carrying out the assigned work. Any damage to the aforesaid properties shall be recovered from the selected party in terms of money or replacement/repair of said property.
  10. The work should be carried out within 30 days at the said site at Worli Mumbai at the said cost after receipt of theWork Order.
  11. The bid should be on actual site visit as per specification given on bidders letterhead.
  12. The bid should be forwarded  in sealed cover mentioning “Repairing of window and white wash & panting of the Residential Quarter at Poonam Apartment, Dr A.B.Road, Worli, Mumbai -400018 shall be submitted on company letter head address to the Deputy Director (Administration Housekeeping), Textiles Committee, P. Balu Road, Prabhadevi, Mumbai 400 025, on or before 05.11.2024 till 3.00 P

Yours faithfully,

Sd/-

Ganesh Bangar Deputy Director (EPQA & Admn-HK)

No. 51/09/2015-AD Date: 17th October, 2024 The Textiles Committee, under the Ministry of Textiles, Government of India, invites bids for the repair and whitewashing, along with painting, of a resident...

Announcement, Walk in interview
Posted 1 year ago
Expires in 18/10/2024
Scheme: Scheme for Capacity Building in Textiles Sector – SAMARTH Advertisement No.: RSA/2024-25/04 Interview Date and Time Date: 18th October 2024, Time: 11:00 a.m. onwards Reporting Time: 10:15 a.m. Reporting Venue: Regional Office of the Textiles Committee, (Government of India, Ministry of Textiles) Apparel House (5TH Floor), Institutional Area, Sector-44, Gurugram-122003 (Haryana) Tel: 0124-2544201/202 Positions Available Position: Project Associate Number of Positions: Two (2) Note: This position is purely on a contract basis and coterminous with the SAMARTH Scheme (up to 31/03/2025). Conditions for Candidates
  • The candidate should bring the application in the prescribed format (application form), accompanied by a self-attested copy of certificates and testimonials and a recent passport size photograph at the time of the walk-in interview.
  • The candidate should bring their original supporting documents (Date of Birth, education, experience, valid Government ID, etc.) at the time of the walk-in interview for verification.
  • If the candidate does not fulfill the eligibility criteria or the documents are not verified, he/she will not be eligible for further processing and will be treated as rejected.
  • No allowances/compensations are applicable other than the consolidated pay.
  • During the period, no earned leave or medical leave is permitted. Paid leave of absence will be allowed at the rate of 1 day for each completed 1.5 months of service or will be given as per rules.
  • Candidates should note that, if at any stage of engagement, it is found that the candidate has submitted any false/fabricated information/documents, his or her candidature will be cancelled immediately, and he/she will be liable for action as per the law or rules.
  • The offer is purely on a temporary basis and for a short-term period, as mentioned in the advertisement. No right shall be conferred on the selected persons for appointment on a regular basis or for continuation beyond one year. The candidate should note that their candidature at all stages of engagement is purely on a contract basis.
  • No TA/DA will be paid for the purpose of attending the interview.
  • Announcements: All further announcements/details pertaining to this process will only be published/provided on the Textiles Committee website, https://textilescommittee.nic.in, from time to time. Candidates are advised to regularly track the website for details and updates.
  • Retired personnel from services of government departments/agencies, cooperative banks, or similar institutions may also appear for the interview. However, the terms and conditions for remuneration of such candidates would be as per the prevailing DoPT / GoI guidelines.

Scheme: Scheme for Capacity Building in Textiles Sector – SAMARTH Advertisement No.: RSA/2024-25/04 Interview Date and Time Date: 18th October 2024, Time: 11:00 a.m. onwards Reporting Time: 10...

Tender
Posted 1 year ago
Expires in 24/09/2024
Scheme: Scheme for Capacity Building in Textiles Sector – SAMARTH Advertisement: RSA/2024-25/03 Interview Date and Time: 23rd September 2024, 11:00 a.m onwards Reporting Time: 10:15 a.m Reporting Venue: Regional Office of the Textiles Committee, Government of India, Ministry of Textiles) Apparel House (5TH Floor), Institutional Area, Sector-44 Gurugram-122003 (Haryana) Tel: 0124-2544201/202 Positions Available: Project Associate: One (1) Position Note: This position is purely on a contract basis and coterminous with Samarth Scheme (Up to 31/03/2025).

Conditions for Candidates

  1. The candidate should bring the application in the prescribed format (application form) accompanied by a self-attested copy of certificates, testimonials, and a recent passport-size photograph at the time of the walk-in interview.
  2. The candidate should bring their original supporting documents (D.O.B., education, experience, valid Government ID, etc.) for verification.
  3. If the candidate does not fulfill the eligibility criteria or the documents are not verified, he/she will not be eligible for further processing and will be treated as rejected.
  4. No allowances/compensations are applicable other than the consolidated pay.
  5. During the period, no earned leave or medical leave is permitted. Paid leave will be allowed at the rate of 1 day for every 1.5 months of service.
  6. If any false/fabricated information/documents are submitted, the candidate's engagement will be immediately canceled and liable for legal action.
  7. The offer is purely temporary and for a short-term period. No rights are conferred for a regular appointment or continuation beyond one year.
  8. No TA/DA will be paid for attending the interview.
  9. All announcements regarding this process will be published on the Textiles Committee website (https://textilescommittee.nic.in/) regularly. Candidates should track the website for updates.
  10. Retired personnel from government services may also appear for the interview.

Eligibility Criteria

Position: Project Associate
No of Position: 01
Emoluments: Consolidated pay up to Rs. 70,000/- (Depending on experience & qualifications). In case of retired personnel, the emolument will be as per DoPT guidelines but not exceed Rs. 70,000/-.
Terms of Employment: Purely contractual till 31st March 2025 or till the completion of Samarth Scheme, whichever is earlier.
Organization: Textiles Committee
Division: RSA (Resource Support Agency)
Place of Posting: Tentatively at New Delhi; may also be placed in RSA (HQ) Mumbai.
Educational Qualification(s): Essential: Bachelor Degree in any discipline. Desirable: Master Degree or MBA.
Experience: Essential: At least 5 years of experience in general office administration at a senior level, with thorough knowledge of financial rules.
Skill Requirements : a) Writing skills in English and working knowledge of more Indian languages will be preferable b) Experience in working with all tools and application software relating to document actions (eg., MS Office, Google Docs etc) and data handling.

Scheme: Scheme for Capacity Building in Textiles Sector – SAMARTH Advertisement: RSA/2024-25/03 Interview Date and Time: 23rd September 2024, 11:00 a.m onwards Reporting Time: 10:15 a.m Reporting...

Tender
Posted 1 year ago
Expires in 17/08/2024

Walk in Interview for Project Associate (On Contract basis)

Scheme: Scheme for Capacity Building in Textiles Sector—SAMARTH Advertisement: RSA/2024-25/02 Interview Date and time: 16th August 2024, 11:00 a.m onwards Reporting Time: 10:15 a.m Reporting Venue: Regional Office of the Textiles Committee, (Government of India, Ministry of Textiles) Apparel House (5TH Floor), Institutional Area, Sector-44 Gurugram-122003 (Haryana) Tel: 0124-2544201/202 Positions Available: Project Associate: One (1) Position Place of Posting: New Delhi Salary:  Upto Rs.70,000/- Download Documents:  Application Form,  Eligiblity Criteria Note: This position is purely on a contract basis and coterminous with Samarth Scheme (Up to 31/03/2025). Conditions for Candidates:
  1. The candidate should bring the application in the prescribed format as per (application form) accompanied by a self-attested copy of certificates and testimonials and a recent passport-size photograph at the time of the walk-in interview.
  2. The candidate should bring their original supporting documents (D.O.B., education, experience, valid Government ID, etc.) at the time of the walk-in interview for verification.
  3. If the candidate does not fulfill the eligibility criteria or the documents are not verified, he/she will not be eligible for further processing and will be treated as rejected.
  4. No allowances/compensations are applicable other than the consolidated pay.
  5. During the period, no earned leave or medical leave is permitted. Paid leave of absence will be allowed at the rate of 1 day for each completed 1.5 months of service or will be given as per rules.
  6. Candidates should note that, if, at any stage of engagement, it is found that the candidate has submitted any false/fabricated information/documents, his or her candidature will be canceled immediately, and he/she will be liable for action as per the law or rules.
  7. The offer is purely on a temporary basis and for a short-term period, as mentioned in the advertisement. No right shall be conferred on the selected persons for appointment on a regular basis or for continuation beyond one year. The candidate should note that their candidature at all stages of engagement is purely on a contract basis.
  8. No TA/DA will be paid for the purpose of attending the interview.
  9. All further announcements/details pertaining to this process will only be published/provided on the Textiles Committee website, https://textilescommittee.nic.in/ from time to time. Candidates are advised to regularly track the website for details and updates.

Walk in Interview for Project Associate (On Contract basis) Scheme: Scheme for Capacity Building in Textiles Sector—SAMARTH Advertisement: RSA/2024-25/02 Interview Date and time: 16th August 2024...

Announcement
Posted 1 year ago
Expires in 17/07/2024
This has reference to the MoT letter No. 14/01/2022-SAMARTH, dated 18th April, 2024 and OM F.No. MOCT/PrAO/BBA/Tex./TSA/2022-23/67-79, dated 24.04.2024 received from O/o Chief Controller of Accounts, Pr AO (BBA) on the subject mentioned above, requesting therein the details of the nominated Central Nodal Agency (CNA), Nodal Officer for the implementation of TSA (Modal-1), opening of TSA account in RBI for onward submission to O/o CGA/GBA. In this regard, the requisite information in respect of SAMARTH Scheme is as under:
Sr. No. Name of the Central Nodal Agency Name of Nodal Officer, Designation Name of the office and address Email address Mobile No. and Landline
1. Textiles Committee, Ministry of Textiles, Govt. of India Shri Sunil S Chauhan, Chief Accounts Officer Textiles Committee, P.Balu Road, Prabhadevi Chowk, Prabhadevi, Mumbai-400025 cao.tc@nic.intccaoho@gmail.com 9987921495, 022-66527-528
Sd/- (S.P. Verma) Secretary Download the Notification here

This has reference to the MoT letter No. 14/01/2022-SAMARTH, dated 18th April, 2024 and OM F.No. MOCT/PrAO/BBA/Tex./TSA/2022-23/67-79, dated 24.04.2024 received from O/o Chief Controller of Accoun...

Walk in interview
Posted 2 years ago
Expires in 07/06/2024
Scheme: Scheme for Capacity Building of Textile Sector - SAMARTH Advertisement No.: RSA/2024-25/01 Interview Date and Time: 07th June 2024, from 11:00 AM to 01:30 PM Reporting Time: On or before 10:15 AM Reporting Venue: Textiles Committee, 2nd Floor, P Balu Road, Prabhadevi Chowk, Prabhadevi, Mumbai 400025 Positions Available:
  1. Consultant - 1 position
  2. Technical Officer - 3 positions
Download Documents:  Application Form |  Eligibility Criteria Note: All positions are on a contract basis and coterminous with the SAMARTH scheme (up to 31/03/2025).

Conditions for Candidates

  1. The candidate should bring the application in the prescribed format as per (application form) accompanied by a self-attested copy of certificates and testimonials and a recent passport size photograph at the time of the walk-in interview.
  2. The candidate should bring their original supporting documents (D.O.B., education, experience, valid Government ID, etc.) at the time of the walk-in interview for verification.
  3. If the candidate does not fulfill the eligibility criteria or the documents are not verified, he/she will not be eligible for further processing and will be treated as rejected.
  4. No allowances/compensations are applicable other than the consolidated pay.
  5. During the period, no earned leave or medical leave is permitted. Paid leave of absence will be allowed at the rate of 1 day for each completed 1.5 months of service or will be given as per rules.
  6. Candidates should note that, if, at any stage of engagement, it is found that the candidate has submitted any false/fabricated information/documents, his or her candidature will be cancelled immediately, and he/she will be liable for action as per the law or rules.
  7. The offer is purely on a temporary basis and for a short-term period, as mentioned in the advertisement. No right shall be conferred on the selected persons for appointment on a regular basis or for continuation beyond one year. The candidate should note that their candidature at all stages of engagement is purely on a contract basis.
  8. No TA/DA will be paid for the purpose of attending the interview.
  9. Announcements: All further announcements/details pertaining to this process will only be published/provided on the Textiles Committee website, https://textilescommittee.nic.in/ from time to time. Candidates are advised to regularly track the website for details and updates.

Scheme: Scheme for Capacity Building of Textile Sector – SAMARTH Advertisement No.: RSA/2024-25/01 Interview Date and Time: 07th June 2024, from 11:00 AM to 01:30 PM Reporting Time: On or before...

Corrigendum

Consequent to the pre-bid meeting held on 10-05-2024 1500 hrs, the late date for bid submission and opening have been modified to 03-06-2024 12:00 hrs and 03-06-2024 12:30 hrs respectively. Vide Bid Corrigendum No GEM/2024/b/4881274-C3,  QCBS parameters in respect of experience have been modified to reflect the last 7 years of experience instead of 5 years for clause 15.4 sl.No 2&3. For further details and to access the bid document, please refer to Bid Number: GEM/2024/B/4881274 dated 23-04-2024 on GEM portal  Please ensure to read the full bid document for comprehensive information and submission guidelines. Date:15-05-2024

Request for Proposal 

The Textiles Committee, under the Ministry of Textiles, Government of India, invites bids for conducting a 'Skill Gap Study in the Textiles Sector at PAN India Level—2024’ through GeM. Interested bidders are requested to submit their proposals through GeM as per the following details:
  • Bid Submission Deadline: 23-05-2024, 11:00 AM
  • Bid Opening: 23-05-2024, 11:30 AM
  • Contract Period: 6 Months Minimum
  • Turnover: ₹3 Crores over the last 3 years
  • Experience Requirement: Minimum 3 years in similar services
  • EMD Amount: ₹2 Lakhs
  • ePBG: 5% of the bid value
Bids must be submitted in two packets and comply with the requirements stated in the bid document. For further details and to access the bid document, please refer to Bid Number: GEM/2024/B/4881274 dated 23-04-2024 on GEM portal Please ensure to read the full bid document for comprehensive information and submission guidelines.

Corrigendum Consequent to the pre-bid meeting held on 10-05-2024 1500 hrs, the late date for bid submission and opening have been modified to 03-06-2024 12:00 hrs and 03-06-2024 12:30 hrs respective...